Skip to content

CLC Jobsite Tour: Inlet View Elementary School Replacement

CLC Jobsite Tour: Inlet View Elementary School Replacement

Friday, March 21, 2025 (12:00 PM - 2:00 PM) (AKDT)

Description

Join the CLC and Cornerstone General Contractors for a site tour of the Inlet View Elementary replacement school on Friday, March 21.

For more information on this project, please visit: https://inletviewreplacement.com/

Space is limited to 15 attendees, and attendees are required to bring their own PPE including hardhat/helmet, vest, glasses, and gloves.

This two-story facility will replace the current single-story building that has been in use since 1957, and increase capacity from 170 students to 289.

The new school will address the following issues:
The current school....

  • Does not meet ASD Education Specification Programming
  • Does not have a sprinkler system for fire protection
  • Does not have a line of sight between the office and the entry
  • Does not meet ASD Standard site requirements
  • Has a student population that exceeds its capacity, and population growth is projected
  • Has infrastructure that is past life expectancy
  • Has high groundwater in the south and drainage needs improvements
  • Had more than 550 work order requests for repairs in 2018
  • Has had “temporary” out-buildings for more than 15 years
Inlet View Elementary School
1219 N Street
Anchorage, AK 99501 United States
Event Contact
Laurel Pagliai
Send Email
Friday, March 21, 2025 (12:00 PM - 2:00 PM) (AKDT)
Powered By GrowthZone